Home Гроші Paul on the lags from plywood

Paul on the lags from plywood

by bestchicago

Paul gives you a lot of trouble, it is impossible to walk around it in winter, even in slippers, the floorboards treacherously bend and creak. So it’s time to make a new floor. Paul gives you a lot of trouble, it is impossible to walk around it in winter, even in slippers, the floorboards treacherously bend and creak. So it’s time to make a new floor. If you want to make the floor as quickly as possible and at the least cash costs, you need a floor on the lags from plywood. You can order the installation of such a sex from professionals from Pol-Master. .

There are many ways to arrange sex. Now we will consider one of the ways that is available to a person who does not have rich experience in the field of construction. We are talking about a plywood field on the lags. In addition to the fact that everyone can make such a floor, this floor can be insulated and all the components of the floor consist of natural natural materials.

Work on installing the floor from plywood into the lags will be divided into several stages.

one. We calculate and buy the necessary material.

2. We dismantle the old floor to a concrete base. We install the lags, having previously laid on the base waterproofing and treating the lags with an antiseptic. The interval between the lags is no more than forty centimeters, the lag should not reach the wall of thirty millimeters. Do not forget to monitor the level of the horizontal lag.

3. After full installation of the lag, you need to make a crate. The distance between the crossbars should be no more than fifty centimeters, it is necessary to calculate the crate in such a way that in the future the plywood falls on the lags and the crate. The crate is attached to the lags and the concrete base.

four. The insulation is installed on the level of the lag thickness, and permamine is attached from above, which protects the insulation from moisture.

5. Now we start installing a plywood floor. The plywood must use the moisture -resistant brands of the FSF, if you think that the floor is subjected to significant loads, then you need to lay the plywood in two layers. Take a plywood ten millimeters thick, drill it in places of attachment around the perimeter with an interval of ten centimeters, not forgetting to unscrew under the hatching hat, and fasten.

Plywood sheets should have a gap to two millimeters, which is then covered with mastic. Then they begin to mount the second layer, but the second layer is made with a displacement, so that the seams of two rows do not coincide with each other and the sheets of the first and second layer, in addition to fastening with self -tapping screws, must also be glued together. After the installation of the second layer, the seams are sealed with mastic.

Having made such a floor, you will receive: an even, beautiful floor that will last a long time, and will not let the cold pass.

You may also like

Leave a Comment

@ BestChicago.net, 2018-2022.